Free Change Order Template
Fill in the fields below and download a complete, signature-ready change order as a PDF. No email, no signup, no watermark — it is yours to send to the general contractor today.
A change order is a written amendment to a construction contract that documents a change in scope, price, or schedule, signed by both parties before the extra work is performed. Without a signed change order, extra work is often treated as unpaid — which is why documenting it the same day matters more than documenting it perfectly.
Your entries are saved in this browser only.
What a change order needs to survive a dispute
Written direction, named and dated
Record who asked for the change, when, and how. A name and a date turn 'they told us to' into evidence.
Scope described in the contract's own language
Mirror the wording of the original scope so it is obvious what is additional and what was already included.
Costs broken into line items
Labor hours, material quantities and equipment listed separately. A single lump sum invites a negotiation you will lose.
Overhead and profit stated, not buried
Show the percentage on its own line. Most contracts already specify an allowable rate — quote it.
Schedule impact in days
Extra work that extends the schedule but claims zero days is how contractors lose delay claims later.
Signatures before the work starts
The signature is the whole point. Work performed on a verbal promise is the single most common reason subcontractors do not get paid.
Read next
Change Order Example: A Filled-In Sample, Field by Field
A worked $3,800 electrical change order, explained field by field — including the exact wording that gets a scope description approved instead of questioned.
What Is a Change Order in Construction?
A change order amends your contract's scope, price, and schedule — and only counts once it is signed. Here is what belongs in one and why they get rejected.
Frequently asked questions
Is this the AIA G701 form?
No. AIA G701 is a copyrighted document published by the American Institute of Architects and must be licensed from them. This is an independent change order form that captures the same commercial information: scope, cost breakdown, schedule impact and signatures. If your contract specifically requires G701, buy it from AIA.
Do I have to give my email to download it?
No. The PDF is generated in your browser and downloads immediately. Nothing is uploaded and nothing is stored on our servers.
Can I use this on a phone at the jobsite?
Yes. The form works on mobile and the PDF downloads to your phone, so you can fill it out in the field and send it before you leave the site.
What markup should I put on a change order?
Check your contract first — most specify an allowable overhead and profit percentage for change orders, and that stated cap is the number that governs. If the contract is silent, use your normal rate and state it plainly on its own line.
What happens if the GC will not sign?
Do not start the work. If you are directed to proceed anyway, send written notice that you are proceeding under protest, keep daily records of labor and materials, and photograph everything. That paper trail is what a time and materials claim is built on.